Environmental Review Documents All Archives

Knauf Culvert Replacement Initial Study Knauf Culvert Replacement Initial Study
The project includes the replacement of an existing culvert within the track ballast of the railroad spur for the Knauf Insulation Inc. (Knauf) City of Shasta Lake Facility. The existing 96-inch diameter corrugated metal pipe culvert within Newtown Creek will be excavated and replaced with an 8-foot by 8-foot concrete box culvert.