|
|
Work includes demolition, clearing and grubbing, grading, excavation, trenching, concrete flatwork, structural concrete, owner furnished pavilion erection, owner furnished pre-fabricated restroom placement, wastewater (mainline & septic), water, storm drain, electrical utilities, pavement markings, asphalt placement, architectural features, traffic control, erosion control for a new community park area complete in place per the plans, specifications, City of Shasta Lake Construction Standards, and these Contract Documents. The work to be done under this contract consists of furnishing all labor, equipment, and materials necessary to perform and complete all work shown on the Plans and called for in these specifications, including all incidental work. All other items or details not mentioned above that are required by the Plans or the Contract Documents shall be furnished, fabricated, constructed, or installed. The Engineer’s Estimate for the base-bid work is $600,000.00.
ADDENDUM 1 ISSUED March 20, 2026.
|
|
|
| 2/24/2026 12:00 PM
|
|
|
| 3/26/2026 2:00 PM
|
|
|
Brennan Adams, Assistant Engineer 530-275-7469 badams@cityofshastalake.gov
|
|
|
| The City of Shasta Lake provides Contract Documents for projects electronically and free of charge via the internet at www.virtual-bid.com/bids-search/cityofshastalake. This site is the only approved location for prospective bidders to obtain official City Contract Documents. NO HARD COPY CONTRACT DOCUMENTS WILL BE AVAILABLE FOR PURCHASE.
|
|
|
| 7:00AM to 4:00PM M-F
|
|
|
| All Contractors and Subcontractors shall possess appropriate Contractor’s Licenses for their trade at the time the contract is awarded
|
|
|
| A prebid conference is scheduled between staff and interested bidders at City of Shasta Lake City Hall, 4477 Main Street, Shasta Lake, on Wednesday, March 11, 2026, at 9:00 a.m., at which time the project will be reviewed. All interested bidders are encouraged to attend.
|
|
|
|
|
|